Copyright 2024 All Rights Reserved.

December 20, 2024

Wind Turbine Fire – Livingston County: Iberdrola’s Streator Cayuga Ridge project –

By John Kraft & Kirk Allen

On February 22, 2016

LIVINGSTON CO, IL. (ECWd) –

Last Friday, another turbine caught fire in Livingston County, Illinois. It was close in location to the turbine fire from last summer (here) and part of Iberdrola Renewable’s Streator Cayuga Ridge project

There were high winds at the time, and local fire departments at the scene could do nothing but watch it burn.

Pontiac and Saunemin Fire Departments were on scene.

Pics below were sent to us thru our facebook page:

SHARE THIS

Share on facebook
Share on twitter
Share on print

RELATED

3 Comments
  • RICK SULLIVAN
    Posted at 12:10h, 23 February

    is that smoke green ?

  • NiteCat
    Posted at 11:57h, 23 February

    High winds? How high? Wind turbines reach peak production at 35mph. Over 45 and they are generally set to shut down for their own safety.

  • sandy gray
    Posted at 13:19h, 22 February

    Another one bites the dust!

$